Stand Alone Power Stations Fringe of Grid

EMC were engaged to design and construct a cost-effective and reliable alternative to replacing poles and wires damaged in bushfires.

Customers: Horizon Power and Western Power (WA Government)

Location: Esperance and Ravensthorpe, 500-700 km south-east of Perth, Western Australia

Features:

  • Multiple systems between 10-80kWh lithium batteries
  • Ground-mounted solar PV systems between 8-20kW
  • Fully remote monitored, maintained and controlled by EMC
  • Opportunity to deliver 100’s of these systems in WA and across Australia
Image placeholder